A map of Bainbridge Island showing existing transmission infrastructure and the selected hybrid solutions to be implemented in the future.

The map shows vegetation management and improved access work along the transmission line connecting Port Madison Substation to Winslow Substation. This same transmission line will also have aging infrastructure replaced.

A new transmission line is displayed connecting Winslow Substation to Murden Cove Substation. This is shown as a diagonal dotted line as a route has not yet been selected.

A ferry icon shows where future electrified ferries will have curtailable load at Winslow. The entire map is laid on a grid structure, indicating conservation technologies which will be implemented throughout the island.